Mid-Peninsula Station Tank 6

Located in the Town of Hillsborough in California, this 3 million-gallon concrete reservoir provides additional storage capacity for the Bayshore District. The project included the replacement of an underground reinforced concrete tank located within an established residential neighborhood. The 3.05 Million Gallon tank was connected to the existing distribution network through newly installed ductile iron pipe. Hydraulic control valves and a new Supervisory Control and Data Acquisition (SCADA) system were installed to provide remote control and management of the reservoir. The site contained over three hundred trees and was limited on three sides by residential homes. There were significant site constraints for construction work and laydown areas. The project required monitoring of mitigation measures established in the project’s CEQA document and the coordination of multiple special inspections.

 

CLIENT

California Water Service

VALUE

$6.4 Million