Front of plant: Regional Environmental Sewer Conveyance Upgrade (RESCU)

The Front of Plant Project consists of the design, construction, permitting, start-up, commissioning, and closeout for a 105-foot deep Receiving Lift Station (RLS), Headworks Facility, Odor Control Facilities, Influent Connector Pipe, Chemical Offload Facilities, Civil site work, Emergency Overflow pipe to storage basin and related process support systems. Work is being implemented under a Progressive Design-Build procurement process in stages. The RLS, surge tower flow, and splitter structure shafts will make it possible for SVCW to transfer influent wastewater flow to the new headworks facility for preliminary treatment. The headworks facility will consist of mechanically-cleaned screens and grit removal tanks. The screened and de-gritted flow will be conveyed to the wastewater treatment plant influent mix box, which is located upstream of an existing, smaller screening facility.

CLIENT

Silicon Valley Clean Water (SVCW)

VALUE

$122 Million